Shipbuilding companies in Northern Europe are known for their innovation and use of advanced technology. The cruise sector is also growing, with an increasing number of people choosing to take cruises for their holidays. The offshore sector is particularly important, as it requires specialized vessels for oil and gas exploration and production. The market is driven by the demand for new ships, particularly in the offshore and cruise sectors. These countries have a long tradition of shipbuilding and are known for their expertise in building high-quality vessels. The shipbuilding market in Northern Europe is dominated by countries such as Norway, Denmark, and Finland. The market is driven by a combination of factors, including the demand for new vessels, the need for maintenance and repair of existing ships, and the growth of the global shipping industry. The region is home to some of the largest shipyards and maritime companies, which have a long history of building and repairing ships of all types and sizes. The shipbuilding and ship repair market in Northern Europe is one of the most important in the world. Part of the reason is the space requirement for slowing and maneuvering the vessel immediately after it has left the slipway, but the sheer size of the vessel causes design problems, since the hull is basically supported only at its end points during the launch process and this imposes stresses not met during normal operation.Shipbuilding and Ship Repair Market in Northern Europe The practice of building on a slipway is dying out with the very large vessels introduced from about 1970. In both cases heavy chains are attached to the ship and the drag effect is used to slow the vessel once afloat until tugboats can move the hull to a jetty for fitting out. This method requires many more sets of ways to support the weight of the ship. The Great Eastern built by Brunel was built this way as were many Landing Craft during World War II. This is done where the limitations of the water channel would not allow lengthwise launching, but occupies a much greater length of shore. Some slipways are built so that the vessel is side on to the water and is launched sideways. On launching, the vessel slides backwards down the slipway on the ways until it floats by itself. At this point the hull is complete and the propellers and associated shafting are in place, but dependent on the depth of water, stability and weight the engines might have not been fitted or the superstructure may not be completed. It is the point where the vessel is formally named. The process of transferring the vessel to the water is known as launching and is normally a ceremonial and celebratory occasion. Provision is made to hold the vessel in place and then release it at the appropriate moment in the launching ceremony, these are either a weak link designed to be cut at a signal or a mechanical trigger controlled by a switch from the ceremonial platform. The weight of the hull is then transferred from the build cribbing onto the launch cradle. (Tallow and whale oil were used as grease in sailing ship days.) A pair of sliding ways is placed on top, under the hull, and a launch cradle with bow and stern poppets is erected on these sliding ways. When it is time to prepare for launching a pair of standing ways are erected under the hull and out onto the barricades. The vessel is built upon temporary cribbing that is arranged to give access to the hull's outer bottom, and to allow the launchways to be erected under the complete hull. The barricades support the two launch ways. Modern slipways take the form of a reinforced concrete mat of sufficient strength to support the vessel, with two "barricades" that extend to well below the water level taking into account tidal variations. Normally they are arranged perpendicular to the shore line (or as nearly so as the water and maximum length of vessel allows) and the ship is built with its stern facing the water. For large ships, slipways are only used in construction of the vessel.
0 Comments
Leave a Reply. |